Fixed Construction Waste Recycling Plant Fixed Construction Waste Recycling Plant

Fixed Construction Waste Recycling Plant

Design Output

According to customer needs.

Application

It is widely used in recycling construction waste.

Equipments

Jaw crusher, impact crusher, air sifter, magnetic separator, feeder, etc.

Get A Free Quote WhatsApp

About Construction Waste

Construction waste refers to the collective term for muck, waste concrete, waste masonry and other wastes generated during the production activities of people engaged in demolition, construction, decoration and repair.

After the recycling of construction waste, there are many types of recycled products, including recycled aggregates, commercial concrete, energy-saving walls, and non-fired bricks.

Shunzhi can not only provide users with construction waste recycling solutions, but also provide a full set of construction waste treatment equipment. In addition, for noise reduction, dust removal and material sorting in the production process, a full set of noise reduction, dust removal equipment and a full gravity classification system can be provided. There are different solutions for different materials. If air separation and flotation are used, it is guaranteed High quality of the finished product. These products have been optimized and strengthened to achieve higher strength, better performance and more compact structure.

Basic Process Of Fixed Construction Waste Recycling Plant

The first stage: Sorting process

Remove large debris from raw materials: wood, plastic, cloth, non-ferrous metals, cables, etc.

The second stage: Iron removal

Remove the residual iron metal in the concrete block and construction waste mixture.

The third stage: Pre-screening link

Remove sand from raw materials.

The fourth stage: Crushing process

Processing large-sized raw materials into small-sized recycled aggregates.

The fixed construction waste recycling plant is composed of crusher, screen, silo, feeder, transporter, ventilation and dust removal equipment and control system. Due to the different raw material conditions and product requirements, there can be different combinations to suit different process requirements and different production scales.

The fifth stage: Screening link

Classify recycled aggregates according to particle size requirements.

The sixth stage: Light material separation

Remove large pieces of light material from raw materials, such as paper, plastic, wood chips, etc.

The seventh stage: Reprocessing link

A variety of modular combinations can be used to produce a variety of green and environmentally friendly building materials such as recycled aggregate, commercial concrete, energy-saving walls, and non-fired bricks.

Main Processing Links Of Fixed Construction Waste Recycling Plant

Main Features:

1.Complete production system is equipped for comprehensive management, it provides integrated control conditions for environmental protection, and effectively controls the production cost.

2.One-time installation and commissioning, it not only fulfills continuous production, but also saves the adjustment time for site moving.

3.Adequate spare parts can be provided to meet the need for continuous production.

Technical description:

1.This process is designed according to the parameters provided by the customer. This flow chart is for reference only.

2.The actual construction should be adjusted according to the terrain.

3.The mud content of the material cannot exceed 10%, and the mud content will have an important impact on the output, equipment and process.

4.Shunzhi can provide technological process plans and technical support according to the actual requirements of customers, and can also design non-standard supporting components according to the actual installation conditions of customers.

Enquiry

If you want to submit a formal inquiry you can do so by submitting the form below.

Tips: Fields marked with * are required.
*
*
-
*
*
*
  •  Stationary Crushing Equipment
  •  Modular/Mobile Crushing Station
  •   Agent
  •   Other
*